• Background-1

100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

Our purpose would be to offer good quality products at competitive price ranges, and top-notch support to clients around the whole world. We're ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for Hips Injection Molding , Sports Injection Mould , Panel Extrusion Tooling , Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding Detail:

case4

Ground Box Mould

Export Country:
India

Completion Time:
1 Month

Tag: Injection Mould

Challange

There are many angle lifters applied for the mould and space for some of the lifters were very tight. But the customer has to get the features as required.

Solutions

Have the mechanism changed for these features.

Product Application Field

Industrial communication cable tray

Main Challenges

The position of the winding reel in the middle of the product has a thin wall thickness and is very dense. EDM processing is very complex, and the mold is very easy to break. There are many defective products and serious material shortage in injection molding. For the wall thickness problem, first, we replaced the product material and used PC + ABS material, which increases the willfulness of the product and is not easy to break; Second mold core material is treated with S136 heat treatment to increase the life of strength die. Second, we make the middle part into replacement inserts, which can not only solve the problems of mold damage and repair caused by improper injection molding operation, but also solve the problem of gas trapping and material shortage of products.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PC+ABS
Project Leader: Ken Yeo

Key Words

PC+ABS, Air Trap, Shrinkage, Distortion


Product detail pictures:

100% Original Factory Manufacturing Of Plastic -
 Cable slack tray – Uni-Moulding detail pictures


Related Product Guide:

owing to excellent assistance, a variety of high quality products and solutions, aggressive costs and efficient delivery, we take pleasure in an excellent popularity amongst our customers. We are an energetic business with wide market for 100% Original Factory Manufacturing Of Plastic - Cable slack tray – Uni-Moulding , The product will supply to all over the world, such as: Gabon , Plymouth , Oman , Meanwhile, we're building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective products, promote perfect services, cooperate for long-term and mutual benefits, firm a comprehensive mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Martin Tesch from Borussia Dortmund - 2017.01.28 19:59
    We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Elizabeth from Bulgaria - 2017.10.13 10:47
    Write your message here and send it to us