• Background-1

Factory wholesale Plastic Product Company - Cable slack tray – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

We have now probably the most innovative production equipment, experienced and qualified engineers and workers, regarded high quality control systems and also a friendly expert income team pre/after-sales support for Injection Molding Usa , Small Injection Molding , Plastic Injection Molds Service , We warmly welcome business partners from all walks of life, expect to establish friendly and cooperative business contact with you and achieve a win-win goal.
Factory wholesale Plastic Product Company - Cable slack tray – Uni-Moulding Detail:

case4

Ground Box Mould

Export Country:
India

Completion Time:
1 Month

Tag: Injection Mould

Challange

There are many angle lifters applied for the mould and space for some of the lifters were very tight. But the customer has to get the features as required.

Solutions

Have the mechanism changed for these features.

Product Application Field

Industrial communication cable tray

Main Challenges

The position of the winding reel in the middle of the product has a thin wall thickness and is very dense. EDM processing is very complex, and the mold is very easy to break. There are many defective products and serious material shortage in injection molding. For the wall thickness problem, first, we replaced the product material and used PC + ABS material, which increases the willfulness of the product and is not easy to break; Second mold core material is treated with S136 heat treatment to increase the life of strength die. Second, we make the middle part into replacement inserts, which can not only solve the problems of mold damage and repair caused by improper injection molding operation, but also solve the problem of gas trapping and material shortage of products.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PC+ABS
Project Leader: Ken Yeo

Key Words

PC+ABS, Air Trap, Shrinkage, Distortion


Product detail pictures:

Factory wholesale Plastic Product Company -
 Cable slack tray – Uni-Moulding detail pictures


Related Product Guide:

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price for Factory wholesale Plastic Product Company - Cable slack tray – Uni-Moulding , The product will supply to all over the world, such as: New York , Borussia Dortmund , Kenya , we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we've gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Renata from Danish - 2017.12.19 11:10
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Martina from Nigeria - 2018.11.06 10:04
    Write your message here and send it to us