Export Country:
South Africa
Completion Time:
1 Month
Tag: Plastic Injection Mold
Time schedule: The customer needed it to be finished within 30 days which is not a small mold and with many processes. Especially for so many ribs to be EDM work.
Several Machines are working for this tool to finish the job as fast as possible. We made it in time.
Outdoor power equipment protection box. It mainly prevents the damage of ultraviolet and acid rain to outdoor power equipment and the pollution of power equipment by dust and mixture.
Because the customer used the pole slack box are made of iron. The cost of iron sheet is high, and it is very easy to be corroded by acid rain, resulting in the product life not meeting the expected requirements. The customer once considered using stainless steel material, but after calculating the cost, he considered developing plastic molds and using PP material + UV. Termination cost to a certain extent, and it is firm and durable.
The cost of iron sheet is high, and it is very easy to be corroded by acid rain, resulting in the product life not meeting the expected requirements. The customer once considered using stainless steel material, but after calculating the cost, he considered developing plastic molds and using PP material + UV. Termination cost to a certain extent, and it is firm and durable.
Because the product is large, the structure belongs to anisotropic structure, and the wall thickness is about 3mm, the conventional design is easy to shrink and deform. Although we have improved the materials, which can reduce certain shrinkage and deformation, the long processing cycle leads to the increase of production cost. Through the efforts of the design and R & D part, we finally reduced the processing time and cost by increasing the size of the gate inlet and adjusting the cooling system and reducing the cooling time and glue injection time.
Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.
Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PP+UV
Project Leader: Ken Yeo