• Background-1

Super Lowest Price Plastic Injection Molding - Pole Slack Box – Uni-Moulding


Product Detail

Product Tags

Related Video

Feedback (2)

Our primary objective is usually to offer our shoppers a serious and responsible small business relationship, offering personalized attention to all of them for Thermoplastic Foam Injection Molding , Plastic Mold Design , Arti Injection Molding , We intention at Ongoing system innovation, management innovation, elite innovation and market place innovation, give full play into the overall advantages, and frequently strengthen services excellent.
Super Lowest Price Plastic Injection Molding - Pole Slack Box – Uni-Moulding Detail:

case5

Pole Slack Box

Export Country:
South Africa

Completion Time:
1 Month

Tag: Plastic Injection Mold

Challange

Time schedule: The customer needed it to be finished within 30 days which is not a small mold and with many processes.  Especially for so many ribs to be EDM work.

Solutions

Several Machines are working for this tool to finish the job as fast as possible. We made it in time.

Product Application Field

Outdoor power equipment protection box. It mainly prevents the damage of ultraviolet and acid rain to outdoor power equipment and the pollution of power equipment by dust and mixture.

Story

Because the customer used the pole slack box are made of iron. The cost of iron sheet is high, and it is very easy to be corroded by acid rain, resulting in the product life not meeting the expected requirements. The customer once considered using stainless steel material, but after calculating the cost, he considered developing plastic molds and using PP material + UV. Termination cost to a certain extent, and it is firm and durable.

Main Challenges

The cost of iron sheet is high, and it is very easy to be corroded by acid rain, resulting in the product life not meeting the expected requirements. The customer once considered using stainless steel material, but after calculating the cost, he considered developing plastic molds and using PP material + UV. Termination cost to a certain extent, and it is firm and durable.

Because the product is large, the structure belongs to anisotropic structure, and the wall thickness is about 3mm, the conventional design is easy to shrink and deform. Although we have improved the materials, which can reduce certain shrinkage and deformation, the long processing cycle leads to the increase of production cost. Through the efforts of the design and R & D part, we finally reduced the processing time and cost by increasing the size of the gate inlet and adjusting the cooling system and reducing the cooling time and glue injection time.

Main Technology

Mold Analysis, CNC Rough Machining, Heat Treating, Finishing Machining, Wire Cutting, EDM, Polishing, Texture.

Mold Details:

Maximum die size: 1100*1000*800mm
Export Area: EU
Delivery time: 45 days
Part Quantity: 5 pcs
Mold Quantity: 4 sets
Number of Processed Sliders: 6 pcs
Mold Material: 718H, NAK80, P20, 718, 45#, etc.
Part Material: PP+UV
Project Leader: Ken Yeo


Product detail pictures:

Super Lowest Price Plastic Injection Molding -
 Pole Slack Box – Uni-Moulding detail pictures


Related Product Guide:

We thinks what prospects think, the urgency of urgency to act from the interests of a client position of theory, allowing for greater high-quality, reduced processing costs, rates are much more reasonable, won the new and previous consumers the support and affirmation for Super Lowest Price Plastic Injection Molding - Pole Slack Box – Uni-Moulding , The product will supply to all over the world, such as: Egypt , Algeria , Bangladesh , We attained ISO9001 which provides solid foundation for our further development. Persisting in "High quality, Prompt Delivery, Competitive Price", we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments. It is our great honor to meet your demands. We are sincerely expecting your attention.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Margaret from America - 2017.02.18 15:54
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Lilith from Tunisia - 2018.11.28 16:25
    Write your message here and send it to us